Contact Us
Quotes, free samples, production line proposals or factory visits — use the form below, or call, WhatsApp or email us directly.
Prefer not to fill in a form? Reach sales directly
- Tel
- +86 159 6558 0973
- +86 159 6558 0973
- [email protected]
- Office hours
- Mon–Sat 8:00–17:30Beijing time (UTC+8)
- Languages
- Chinese, English
Outside these hours, at weekends or on Chinese public holidays, send the form or an email and we reply on the next working day.
Address & map ↓Frequently Asked Questions
Two sets of answers: one for buying empty capsules, one for buying capsule-making machines.
Buying Empty Capsules
Can I get free samples?
Yes. Samples are free up to 1,000 capsules; shipping is paid by the buyer, and we send them within 3 days of confirmation. Click “Free Samples” on the capsules page, or choose “Request free samples” in the enquiry form and leave a delivery address.
What is the minimum order for capsules?
5,000,000 capsules, in any colour and with any logo printed.
What is the lead time for capsules?
In stock: within 10 days of payment. Custom orders: within 30 days of the deposit.
Can you match our colour and print our logo?
Cap and body colours can be chosen separately and text or logos printed; bulk production normally starts after sample approval. We match Pantone references or physical samples and print axially or radially.
Do you offer titanium dioxide-free capsules?
Clear capsules contain none. Opaque and white capsules have traditionally used it as the opacifier, and the EU has banned it in food, food supplements included, so supplements sold in the EU need a TiO₂-free formulation. Our HPMC capsules contain no titanium dioxide. See Colours & Printing.
Which filling machines do your capsules run on?
Compatible with common automatic and semi-automatic fillers. Tested on common NJP-series automatic fillers and on semi-automatic machines.
Buying Capsule-Making Machines
What is the lead time for a capsule-making line?
A complete line takes 3–4 months from contract to shipment, including the factory acceptance test (FAT) before it leaves; individual auxiliary machines and mould pins take 4–6 weeks. Sea freight and on-site installation come on top of that.
Can we see a line you have delivered that is already running?
Start with our reference list (country, capsules made, year in production); see Installations, and tick “Delivered projects” when you send your enquiry. Visiting a customer's plant: can be arranged; it needs that customer's consent first.
Can we visit the factory to see the machines or audit you?
You can book a visit: choose “Visit our factory” in the enquiry form and tell us what you would like to see, your preferred dates and group size. We host visits on weekdays 8:30–17:00; you can see the production halls, QC lab and machine assembly shop. If you can't travel yet, choose “Live video tour” and give a time and your time zone (available on request).
How much space does a capsule-making line need?
It depends on capacity and configuration. A single line needs about 25 × 6 m (the machine itself is about 18.3 × 2 × 2.65 m), plus gel preparation, clean packing and storage areas. We draft a preliminary layout from your building drawings free of charge.
What utilities does the plant need?
Besides electrical power, a plant usually needs hot water or steam for gel preparation, compressed air, and chilled water with air handling units to cool the film as it sets and to control temperature and humidity in the drying kilns. Consumption figures: about 40–55 kW of power per line; the rest comes with the proposal. Machines built for your local voltage and frequency: available.
Can one line make both gelatin and HPMC capsules?
The two gels set in different ways. Gelatin sets as it cools on the pins. HPMC either uses a gelling agent in the solution or sets by thermal gelation on heated pins, and the thermal route needs a dedicated machine configuration. If you plan to make HPMC capsules, tell us which process you intend to use before ordering. Our lines make gelatin capsules and gelling-agent HPMC capsules; a changeover mainly means switching the gel and adjusting drying settings, while thermal gelation needs heated pins.
Do machines include installation and training?
The factory acceptance test, on-site installation and commissioning, and operator training are included in the quotation. Warranty: 12 months. Engineers' travel and accommodation for overseas projects: paid by the buyer.
How do we get mould pins and spare parts later?
Mould pins, wear parts and size change parts can all be ordered separately: use “Get a quote” on the auxiliary machines on the equipment page, or tick what you need in the enquiry form. Spares supplied with the line and lead time for spares: one year of wear parts with the line; common spares within 2–4 weeks.